Synchronize Project

If any changes are made to the Eclipse project source files, then the Synchronize option can be used to re-synchronize the Perforce QAC Project.

From the menu system, this is located at: Perforce QAC > Project > Synchronize

The following synchronization dialog will appear:

Select the type of Synchronization required. Perforce QAC Eclipse supports four types.

  • Process Monitor is described in the main Perforce QAC Manual under the heading "Synchronization via Process Monitoring".

    Then either:

    • Select a pre-existing file containing the build commands
    • Enter build commands in the multi-line text field which is saved back to the location indicated as the build script
  • CDT Process Sync is described in the main Perforce QAC Manual under the heading "JSON Compilation Database". They are synonymous.

  • Build Log is described in the main Perforce QAC under the heading "Manual Synchronization Methods" and sub-heading "Build Log".
  • JSON Compilation Database is described in the main Perforce QAC Manual under the heading "Manual Synchronization Methods" and sub-heading "JSON Compilation Database".

To run analysis immediately after synchronization, select "Run Analysis

At Same Time"

Click Synchronize.

A progress dialog shows the progress and ultimately the result of synchronization.